Track record

The evidence behind the machine

Buying a 45,000 hour asset from a manufacturer you have not bought from before is a decision that needs evidence, not adjectives. This is the record: third-party references, measured field results, and the manufacturing capability behind the units.

45,000
Hour design life, MTG12 and MTP40
1
One service visit per year
57
Patents granted, more in progress
1M+
Fleet run hours to date
Third-party evidence

Third-party references

What other people have published about the technology.

Roland Berger, Energy Cost and Carbon Footprint Reduction for Telecom Companies (June 2020)

Roland Berger's June 2020 study for telecom operators lists microturbine gensets among the opportunities for off-grid tower power, citing the planned Alkan CIT deployment across Africa and the Middle East and an expected 30% cost reduction against conventional diesel gensets. The study attributes the 30% figure to Bladon (footnote 11, chapter 2).

Read the study (PDF, rolandberger.com)

Winner, Vodafone Renewable Energy Challenge

Bladon was announced as the winner of the Vodafone Renewable Energy Challenge in February 2023, selected for the potential of the microturbine genset to cut diesel use and emissions across off-grid network sites.

Read the announcement
Capability

Built to scale

A 45,000 hour asset is only worth buying from a manufacturer that will still be there to support it.

Leamington Spa
UK design and manufacturing
14,000 m²
Manufacturing facility
~12,000 units
Annual production capacity
57
Patents granted, more in progress

Part of the Ryse Energy group

Bladon is part of the Ryse Energy group, which gives off-grid site operators a combined renewable and microturbine offer from a single supplier - wind and solar generation alongside a fuel-flexible genset, on one service visit a year.

How the combined offer works

Test it against your own numbers

Model your fuel prices, run hours and service costs, or talk to an engineer about a site-specific assessment.